Latest
FG suspends Aseese Bridge construction as traffic gridlock sparks outrage
The Federal Government has suspended the construction of a pedestrian bridge at the Aseese section of the Lagos-Ibadan Expressway following a massive traffic gridlock that trapped thousands of motorists and commuters for more than 20 hours.
The suspension followed widespread outrage over the traffic management arrangements adopted for the project, which left motorists stranded overnight, forced commuters to trek several kilometres and triggered a sharp increase in transport fares along the busy Lagos-Ogun corridor.
The construction, being handled by the Federal Ministry of Works in collaboration with CBC Construction Company, was initially scheduled to run from Wednesday, November 18, to Sunday, November 22.
To facilitate the installation of the pedestrian bridge, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) had announced a temporary diversion of Lagos-bound traffic towards the Lagos carriageway at Aseese, with motorists expected to rejoin their normal route at a designated exit opposite Christ Embassy.
However, the diversion resulted in severe congestion from about 2pm on Wednesday, with traffic stretching through the night and into Thursday afternoon.
The situation left commuters with journeys that ordinarily take minutes lasting several hours. Some passengers travelling from Ibadan shortly after 11am reportedly did not reach Magboro until about 5.30pm, while another motorist said he spent eight hours travelling from Mowe to Magboro.
With vehicles barely moving, several motorists abandoned their cars and trekked to their destinations.
READ ALSO; Lagos-Ibadan expressway remains blocked as gridlock sparks robbery fears [VIDEO]
Commercial transport operators also capitalised on the situation to increase fares. The cost of travelling from Mowe to Berger reportedly rose from the usual N700-N800 to as much as N3,000, while some commercial motorcyclists demanded between N5,000 and N6,000 for journeys that normally cost considerably less.
The congestion was further aggravated by motorists driving against traffic in desperate attempts to escape the gridlock.
The development attracted criticism from Sunday Dare, Special Adviser to President Bola Tinubu on Media and Communications, who questioned the decision to undertake the construction during peak traffic hours.
In a Facebook post on Wednesday night, Dare disclosed that he had spent more than five hours trapped in traffic while travelling from Lagos to Ibadan for media engagements ahead of the APC presidential rally scheduled for Saturday.
He criticised the contractor for failing to schedule the construction during nighttime when traffic was considerably lighter.
He described the situation as unnecessary hardship, particularly for thousands of commuters forced to abandon their vehicles and trek home.
Other motorists also took to social media to recount their experiences, with one truck owner reporting that his vehicle spent 12 hours in the gridlock.
By Thursday afternoon, traffic movement had improved along the affected section.
Following the disruption, TRACE announced the indefinite suspension of the construction-related traffic diversion pending further directives from the relevant authorities.
The agency’s spokesperson, Babatunde Akinbiyi, said the decision followed the traffic challenges experienced between Wednesday and Thursday morning.
He apologised to motorists for the inconvenience, delays and discomfort caused by the exercise.
The acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, also confirmed the suspension, attributing it to the traffic situation.
Meanwhile, commuters have called on the Ogun State Government to rehabilitate inner roads connecting the expressway, arguing that functional alternative routes would reduce the impact of future traffic disruptions.
Others urged the Federal Government to strengthen supervision of contractors handling projects along major highways, insisting that infrastructure development should not come at the expense of citizens’ welfare.
The incident has renewed concerns over traffic management, construction scheduling and the need for effective alternative routes along one of Nigeria’s busiest transportation corridors.
-
Featured6 days agoNigeria’s youth unemployment paradox: Graduates struggle as millions survive in informal jobs
-
Business7 days agoNigerian Banks earn N521.8bn from E-banking, card fees in nine months
-
Energy6 days agoNigeria’s power crisis deepens as ₦639bn unpaid gas debt threatens electricity supply
-
Latest7 days agoDalung claims ‘message from Buhari’s grave’ urges Nigerians to vote Atiku in 2027
-
Featured5 days agoTinubu’s Renewed Hope: Reforms, hardship and the unanswered question of a second term
-
Featured5 days agoThe cost of Renewed Hope: How Nigeria’s economic reforms are reshaping everyday family life
-
Latest7 days agoOndo shuts ponmo processing centre after discovery of human waste
-
Featured1 week agoBreaking: Manchester United sack Michael Carrick after poor start to Premier League season


