News
Sanwo-Olu inspects Red line train facilities ahead of commissioning
Lagos State Governor Babajide Sanwo-Olu, Saturday, took a test run of the Red Line train, inspecting the tracks and the rail corridors for another time ahead of next Thursday formal commissioning of Lagos Rail Mass Transit (LRMT) infrastructure.
The 37-kilometre rail line, built by the Lagos Metropolitan Area Transport Authority (LAMATA), will be inaugurated by President Bola Ahmed Tinubu, along with its stations and other ancillary facilities. The Red Line traverses seven stations from Agbado, a boundary town in Ogun State, to Oyingbo in Lagos Central.
Sanwo-Olu took journalists on a train ride from the Ikeja Mega Station of the Red Line in a last-minute effort to make the infrastructure ready for opening.
Joining the Governor on the ride was the Deputy Governor, Dr. Obafemi Hamzat, and members of the State cabinet.
The Red Line train, which left the garage track for the first time since it was delivered, departed from Ikeja Mega Station at exactly 2:23pm, moving steadily towards Agbado Station.
Six minutes later, the passengers arrived at Agege Station. The journey proceeded to Iju Station, arriving at 2:38pm — 15 minutes after leaving Ikeja.
READ ALSO: You’re everlasting winners, Sanwo-Olu hails Davido, others
While on board, Sanwo-Olu and his deputy moved along the coaches in a bid to ascertain the conditions of the train’s cars — a set of Talgo wagons built in Milwaukee, Wisconsin in the United States.
Some of the comfort facilities inspected by the Governor included the train’s cooling system, handrails, cushioned seats and in-built safety features of the wagons.
After the inspection, Sanwo-Olu said the train line was ready for commissioning, but added that there would be continuous enforcement to clear the train path of unapproved activities.
He said: “We just completed another inspection of the Red Rail Line facility and corridor; now we are back in Ikeja Mega Station. We all have just used the train to Iju and back. I’m sure our media men can fully report what we all witnessed in the course of the short journey. This rail infrastructure is ready for inauguration, but we still have a few cleaning to do.
“The challenge we have is the pedestrian interference on the rail track and unapproved activities seen along the corridor. We will continue with the enforcement we started against illegal use of the rail corridor. We are in talks with NRC (Nigeria Railway Corporation) to reinforce the train route with physical barriers to limit pedestrian interference.”
The Governor urged the State’s residents to adhere to the rules of using the rail line, noting that infrastructure was not built for commercial activities.
The train operation, Sanwo-Olu said, would be regular and trips would be made every 15 minutes. He said it was necessary to eliminate incidents that could result in fatality along the track.
“We have reduced human interference on the track considerably over the last two months, but enforcement continues. The stations are ready, the trains are ready and I believe Lagosians are ready to welcome this new infrastructure built for their use and benefit,” Sanwo-Olu said.
-
Featured1 week agoTinubu’s Renewed Hope: Reforms, hardship and the unanswered question of a second term
-
Featured7 days agoThe cost of Renewed Hope: How Nigeria’s economic reforms are reshaping everyday family life
-
Crime4 days agoKwara bandit deal under scrutiny as footage shows security operatives negotiating with terrorists [VIDEO]
-
Business7 days agoCBN forex reforms under scrutiny as Nigeria’s reserves drop $300m in 10 days
-
Business7 days agoNCC plans spectrum incentives to push telecom operators into more network investment
-
Entertainment6 days ago2027 Grammys: Asake, Wizkid, Tems, Ayra Starr lead Nigerian nominees in African music category
-
Latest7 days agoNigeria’s security crisis deepens as October death toll hits 835, highest in 2026
-
Sports1 week agoKenya’s Timothy Kibii wins Port Harcourt International Marathon


